Demo Question 5.
Three EliteCertify switches are connected as shown below: Switch EliteCertify 3 is configured with UplinkFast. If L2 were to fail, how much time will pass before Switch EliteCertify 3 activates the port connection to L3?
A. 1-5 seconds
B. 15-20 seconds
C. 30-35 seconds
D. 45 seconds
E. 60 seconds
F. None of the above.
Display Answer
Purchase Full Version:
642-811 Printable PDF Prep Guide $49.95 BUY NOW!
642-811 Test Simulation Engine $69.95 BUY NOW!
642-811 PDF & Test Simulation Engine $99.95 BUY NOW!
Answer: A
Explanation: If SwitchC detects a link failure on the currently active link L2 (a direct link failure),
UplinkFast unblocks the blocked port on SwitchC and transitions it to the forwarding
state immediately, without transitioning the port through the listening and learning states.
This switchover takes approximately one to five seconds.
- Based on the latest 642-811 exam objectives!
- Designed like actual 642-811 exam questions!
- 100% Verified Realistic 642-811 Exam Questions and Answers!
- Exhibits, Drag&Drop and Simulation 642-811 Questions Included!
- Constantly Updated Guide to Reflect the Current 642-811 Exams!
- Detailed Explanations for Most Guide Practice Exams!

Demark
Took my last CCNP test last Friday. EliteCertify tests really made the difference, I passed every one on the first ...

England
Many thanks to your complete solution in 3Com Test Simulation Engine, Study Guides and PDF practice exams which are very ...

NY, USA
I wanted to take a few minutes to thank EliteCertify for passing 3 exams towards my MCSE. ...